LogoASCEND
Est. 1991 — Chicago, IllinoisASME A17.1 · IBC Compliant

WE
INSTALL

THE
RISE

Commercial elevator installation, cab modernization, and freight conversion for the contractors and developers who build the skyline. We thread steel rails through the skeletons of buildings still smelling of wet concrete.

Download Spec Sheet
340+
Installations Complete
47
Active Jurisdictions
22
Floors, Max Single Project
6,000
lbs Freight Capacity
Elevator shaft interior with vanishing-point perspective showing steel rails ascending through multiple floors in an open concrete shaft

"When the building opens, the elevator is the first thing every tenant judges. We make sure they never think about it twice."

James Kowalski — Lead Installation Engineer, Ascend

Trusted by the builders who build
TURNERTurner Construction
·
SKANSKASkanska USA
·
CLARKClark Construction
·
McCARTHYMcCarthy Building
·
WALSHWalsh Group
·
MORTENSONMortenson
·
GILBANEGilbane Building
·
DPRDPR Construction
·
HENSEL PHELPSHensel Phelps
·
JE DUNNJE Dunn
·
WHITING-TURNERWhiting-Turner
·
PCLPCL Constructors
·
TURNERTurner Construction
·
SKANSKASkanska USA
·
CLARKClark Construction
·
McCARTHYMcCarthy Building
·
WALSHWalsh Group
·
MORTENSONMortenson
·
GILBANEGilbane Building
·
DPRDPR Construction
·
HENSEL PHELPSHensel Phelps
·
JE DUNNJE Dunn
·
WHITING-TURNERWhiting-Turner
·
PCLPCL Constructors
·

"Specified on 47 active construction projects across the midwest and southwest — from 3-story medical facilities to 22-floor mixed-use towers."

Selected Projects§ 02

Built for the
long haul.

Every project documented with full tonnage specs, code compliance jurisdictions, and cab finish photography. No stock imagery.

Luxury hotel lobby with polished elevator doors in brushed bronze finish, marble floors, and warm accent lighting
Hotel Retrofit
22-Story Cab Replacement — Phoenix, AZ2024

The Meridian Phoenix

When the Meridian's original 1987 hydraulic cabs began failing inspections, general contractor Sunstate Build contracted Ascend for a full 22-floor modernization. The scope: four passenger cabs, one service elevator, all replaced in-place without closing the hotel. We phased the work over 11 weekends, staggering cab shutdowns so at least three units remained operational at all times.

Project Specifications
Capacity2,500 lbs / 15 passengers
Speed350 fpm
Cab FinishBrushed bronze, stone floor, LED cove
CodeASME A17.1-2019, ADA Title III
Duration11 weekends, zero hotel closures
Industrial warehouse interior with stainless steel freight elevator doors and concrete floors in cold storage facility
Freight Conversion
Northbrook Cold Storage
Industrial Freight — Chicago, IL2024

A 1962 warehouse receiving a cold-storage conversion needed a freight elevator rated for 6,000 lbs with stainless steel interior to meet USDA facility standards. Ascend engineered the pit and overhead clearances within the existing shaft — no structural modification to the building envelope.

Specifications
Capacity6,000 lbs freight
InteriorType 304 stainless, washdown-rated
TemperatureRated to -10°F ambient
CodeASME A17.1, USDA 7 CFR Part 58
Floors5
Modern corporate office lobby with dark walnut elevator doors, polished concrete floors, and warm architectural lighting
New Construction
Harrington Corporate HQ
Class A Office Tower — Dallas, TX2025

Harrington Capital's 18-floor headquarters specified custom cab interiors as a brand expression — walnut veneer, blackened steel thresholds, and recessed lighting programmed to shift from cool white in morning hours to warm amber by end of day. Six passenger cabs, one dedicated executive cab.

Specifications
Units7 total (6 passenger, 1 executive)
Speed500 fpm
Cab FinishAmerican walnut, blackened steel, programmable LED
CodeIBC 2021, ASME A17.1-2019
Floors18
"The scroll earns trust through accumulated evidence, not emotional persuasion — every tonnage figure, every code citation, every finished photograph is a brick in the wall of credibility."

— Ascend Project Management Philosophy

Scope of Work§ 03

Three disciplines.
One contractor.

Construction workers in hard hats reviewing blueprints inside a high-rise building under construction with steel framework visible
01
New Construction01

Built into the structure from day one.

We coordinate directly with your structural engineer and project superintendent to rough-in the shaft, install the rail system, and commission the cab before certificate of occupancy. Our pre-construction review catches spec conflicts before they become change orders.

  • Shaft layout and pit/overhead coordination
  • Steel rail installation and alignment
  • Machine room and MRL configurations
  • Full commissioning and ASME inspection
  • As-built documentation for facility management
Modern elevator interior with brushed stainless steel walls, polished stone floor, and recessed LED lighting in a luxury building
02
Modernization02

The cab your tenants remember from the opening week.

Aging hydraulic and traction systems fail quietly — until they don't. Ascend's modernization program replaces controls, cab interiors, door operators, and drive systems while your building stays occupied. We've completed 47 modernizations without a single unplanned building closure.

  • Controls replacement (relay to solid-state)
  • Drive system upgrades (hydraulic to MRL)
  • Cab interior: steel, stone, wood, glass options
  • Door operator and safety device replacement
  • ADA compliance upgrades to Title III
Elevator technician in hard hat and safety vest performing maintenance inspection inside elevator mechanical room
03
Maintenance Contracts03

The crew that answers at 2 a.m.

A maintenance contract with Ascend means a dedicated technician assigned to your property — someone who knows your specific units, your tenants, and your building manager by name. We offer monthly, quarterly, and annual maintenance programs with 4-hour emergency response SLAs.

  • Dedicated technician per property
  • Monthly, quarterly, or annual programs
  • 4-hour emergency response SLA
  • Digital maintenance logs accessible to your FM team
  • Annual ASME and local code compliance documentation
Start a Project§ 04

Ready to
ascend?

Send us your project type, floor count, and any spec documents you have. We'll return a preliminary bid within 48 business hours — no sales call required.

48hr
Bid turnaround
100%
Licensed & bonded
32yr
In operation
Lighter Intent

Download Our
Spec Sheet

Full product specifications, cab finish options, tonnage ratings, and code compliance documentation. 14 pages, PDF.

We'll send the PDF to your work email. No sales follow-up unless you request one.

Passenger cab dimensions & weight ratings
Freight elevator specifications to 10,000 lbs
Cab finish material library (40+ options)
ASME A17.1 & IBC compliance matrix
Modernization scope templates